Summary
Traditionally, our courts have held that damages are to be assessed as of the date of the breach of contract and have refused to consider events that have transpired between the date of breach and that of trial.
Why Hypothesis Should Not Replace History: Admissibility of Hindsight in Damage Claims
PDF, Size: 214 KB